
Started work on the Sawmill section. Decided that the Sawmill needed a hero point to give it a reason to exist. So a large hill was formed behind the mill with many limbs and top lopped trees ready to be cut down.
New sapling trees have been added to the hill as a reforestation plan.

I added a drag line down the hill and a motorized donkey engine at the top to drive the line. I then painted the hill brown over the plaster bandage to give it a dirt look and darker shades where the logs would have been dragged down the hill, these were then coated with several coats of Mod Podge to give a wet look, I then added some fine ground cover sparingly.
Whisper to you next Saturday. Bye Cobber.